Material certifications, in-process inspection and final sign-off follow every job from the purchase order to the packing slip.
We document what we make. Material certifications, in-process inspection, and final sign-off follow every job from the purchase order to the packing slip. When a customer asks what heat of steel a part came from three years ago, we can answer.

Mill certs are tied to the job when material is received, archived, and retrievable by part number years later. Ask what heat a part came from and we can answer.
Operator self-inspection during the run and a final inspection against the print, recorded per part number. Reports ship with the parts when the order asks for them.
New parts and revisions get a feature-by-feature first article before the run continues, so a drawing error is found on one part, not fifty.
Documented disposition and corrective action when something is out of tolerance. A conversation on the floor is not a record.
The inspection department, as listed on the equipment page.
Upload a drawing, tell us the quantity and the material, and we'll come back with a quote and a realistic date. Not an optimistic one.